After adding the VE2 table to the VE1 table, ZERO the VE2 table parameters!
To be on the safe side, you could reduce the entire VE1 table by 2%, then increase the BPW parameter by adding 2 to the current value and see what happens in the data log.
dave w
Bookmarks